Infrastructure charges (headworks) by SEQ council, 2026
Indicative 2026 infrastructure charges per new residential lot in SEQ: Brisbane $28K, Logan $20K, Moreton Bay $22K, Ipswich $18K, Gold Coast $26K, Sunshine Coast $24K, Redland $25K. Per additional dwelling (not new lot) is typically 50-70% of the per-lot rate. Existing dwelling credit applies — a 1→2 lot subdivision pays on 1 new lot.
Line-by-line cost breakdown
| Line item | Range | Notes |
|---|---|---|
| Brisbane City Council — per new lot | $28,000 | Highest in SEQ; mature trunk infrastructure. |
| Brisbane City Council — per additional dwelling | $15,000–$22,000 | Applies to townhouses, multiple dwelling MCUs. |
| Gold Coast — per new lot | $26,000 | Comparable to Brisbane; PDA precincts may apply different rates. |
| Sunshine Coast — per new lot | $24,000 | Slightly lower than Brisbane / Gold Coast. |
| Redland — per new lot | $25,000 | Bayside premium reflects mature infrastructure. |
| Moreton Bay — per new lot | $22,000 | Mid-tier; growth-corridor precincts may differ. |
| Logan — per new lot | $20,000 | Below SEQ average. |
| Ipswich — per new lot | $18,000 | Lowest in SEQ; aligned with growth-corridor pricing strategy. |
| Total | $18,000–$28,000 | indicative per new residential lot, varies by council |
Variables that move the total
Existing dwelling credit
Most subdivisions get a credit for the existing lot — a 1→2 pays on 1 new lot, a 1→3 pays on 2.
Trunk vs non-trunk
These figures cover trunk infrastructure (water, sewer, parks, transport). Non-trunk works are separate.
Offset agreements
Where a developer funds trunk infrastructure as part of the project, offset against the headworks. Negotiated case-by-case.
Indexation
Charges are indexed annually. 2026 figures shown; 2027 will rise typically 3-6%.
Council-by-council variation
| Council | Note |
|---|---|
| Brisbane City | Highest; reflects mature trunk infrastructure and high demand. |
| Gold Coast | Comparable to Brisbane; PDA areas may have separate rates. |
| Logan | Strategically low; supports the council's growth-corridor pricing. |
| Ipswich | Lowest in SEQ; consistent with cheapest land prices. |
What's NOT included in the total
- Property development cost (land + build).
- Council application fees.
- Operational works construction.
- GST (infrastructure charges are not subject to GST).
Common questions about infrastructure charges (headworks) by seq council, 2026
- Are infrastructure charges negotiable?
- Base rates set by adopted council resolution are not negotiable. Offset agreements (where developers fund trunk infrastructure as part of the project) can be negotiated and reduce the cash component.
- Are infrastructure charges GST-applicable?
- No — they're a regulatory fee, not subject to GST. Build them into your feasibility net of GST.
- When do I pay?
- An Infrastructure Charges Notice (ICN) issues shortly after DA approval. Payment is required before the council seals the survey plan (RoL) or issues the Compliance Certificate (MCU).
Related
Run this feasibility on a real SEQ listing. First brief tomorrow morning.
Create your account$500 / mo · or $4,800 / yr (save 20%) · cancel any time
Other cost guides
Subdivision cost in Brisbane
$108,000–$193,000
1→2 lot RoL, excluding land
Read guideDuplex / dual occupancy build cost in Brisbane
$1,850,000–$2,550,000
complete duplex project including land
Read guideTownhouse development cost in Brisbane
$3,800,000–$4,700,000
complete 4-pack townhouse project including land
Read guideGranny flat cost in Brisbane
$180,000–$280,000
turn-key 70–80m² Class 1a granny flat
Read guideDevelopment Application (DA) cost in Brisbane
$15,000–$80,000
complete DA package, varies by type
Read guideTownhouse development cost on the Gold Coast
$4,300,000–$5,500,000
complete Gold Coast 4-pack townhouse project including land
Read guideGranny flat cost in Moreton Bay
$170,000–$270,000
turn-key 70-90m² Moreton Bay secondary dwelling
Read guide