Cost guide
Subdivision cost in Brisbane
$108,000–$193,000
1→2 lot RoL, excluding land
Indicative all-in cost for a 1→2 lot Code Assessable Brisbane subdivision is $108,000–$193,000 excluding the original land purchase. Infrastructure charges (~$28K per new lot) and operational works construction ($40K–$90K) are the largest line items. 1→3 subdivisions typically run $180,000–$300,000.
Read full breakdownCost guide
Duplex / dual occupancy build cost in Brisbane
$1,850,000–$2,550,000
complete duplex project including land
Indicative all-in cost for a Brisbane LMR duplex (dual occupancy) project: land $1.0M–$1.4M, build $700K–$950K (both dwellings), planner/architect/engineer $40K–$70K, infrastructure charges $30K–$45K, finance and holding $80K–$140K. Total project cost $1.85M–$2.55M. End-product value $2.2M–$3.0M combined. Gross development margin 18–28%.
Read full breakdownCost guide
Townhouse development cost in Brisbane
$3,800,000–$4,700,000
complete 4-pack townhouse project including land
Indicative all-in cost for a Brisbane LMR2 4-pack townhouse project: land $1.0M–$1.4M, build $2.4M–$2.8M (4 × 3-bed at $600–700K each), planner/architect/engineer $80K–$120K, infrastructure charges $60K–$80K, finance and holding $200K–$300K. Total project cost $3.8M–$4.7M. End values $4.6M–$5.6M (4 × $1.15M–$1.4M each). Gross developer margin 16–22%.
Read full breakdownCost guide
Granny flat cost in Brisbane
$180,000–$280,000
turn-key 70–80m² Class 1a granny flat
Indicative all-in cost for a turn-key 70–80m² Class 1a granny flat (secondary dwelling) in Brisbane: $180,000–$280,000. Includes design, building approval, slab, frame, fit-out, services connection, and finishes. Generally NO planning DA required if within Brisbane's Accepted thresholds. Rents $450–$650/week separately let — gross marginal yield 8–15%.